The plant dashboard for logistics and warehousing
Docks, forklifts and high-bay racking.
Try the demo free See the pricing
- 9 standard areas loaded
- 5 lockout energy sources
- 5 reference standards

How the work is done in logistics
A continuous flow of goods with peaks of activity: the dominant risk is being struck by a vehicle and falling loads. Housekeeping is the cheapest safety measure there is.
The jobs that set the pace
- Loading and unloading at the docks
- High-bay storage
- Order picking
- Conveyor maintenance
- Forklift battery management
The areas it comes with as standard
- Goods-in dock
- Dispatch dock
- Aisle A · conventional racking
- Aisle B · drive-in racking
- Picking area
- Temperature-controlled chamber
- Pallet yard
- Forklift workshop
- ADR area
Lockout/tagout, with isolation point and verification
The dashboard does not ask “what energies does your equipment have?”: in the logistics profile they are already there, each one with where it is isolated and how you check that it is isolated. It is what an inspection asks to see in writing.
| Energy | Isolation point | Verification |
|---|---|---|
| Electrical | Conveyor isolator | Verification of the absence of voltage |
| Pneumatic | Dock leveller valve | Bleed and gauge at 0 bar |
| Hydraulics | Dock leveller power pack | Platform lowered and chock in place |
| Stored mechanical energy | Stacker crane lockout in position | Brake applied and rail chock in place |
| Traction battery | Disconnection of the battery connector | Voltage check at the terminals |
The high-risk procedures, written down
Five procedures specific to logistics, written in the vocabulary of the sector and available inside the dashboard so you can adapt them to your plant.
Loading dock
Wheel chocks and lorry restraint: a trailer that moves half a metre drops the forklift into the pit.
Conveyor lockout
The classifier has remote starts: local lockout and a signal to the control room before putting your hand in.
Work on racking
Check racking uprights for impact damage and work at height from a platform, never on the beams.
Battery charging room
Ventilation for hydrogen, eye protection against the electrolyte and dedicated extinguishing media.
Traffic and pedestrians
Physical separation of flows and a defined priority: a hi-vis vest does not stop a forklift.
Equipment and reference regulations
Equipment typical of this profile
- Counterbalance forklift
- Reach truck
- Stacker crane
- Roller conveyor
- Dock leveller
- Pallet wrapper
- Battery charger
- High-speed door
Regulations that frame the work
- RD 1215/1997 · work equipment
- UNE-EN 15635 · use and maintenance of racking
- ADR · dangerous goods
- RD 486/1997 · workplaces
- RD 487/1997 · manual handling of loads
Current references the dashboard uses to organise the documentation. IndustriaKit is a documentation tool: it does not replace the risk assessment or legal advice.
- Annual racking inspection
- Forklift driving authorisation
- ADR safety adviser certificate
What the dashboard does with all this
Contractors and coordination of activities
Contractors working on site join free, upload their documentation and the traffic light decides who can work. RD 171/2004 coordination with minutes and signature.
Permits with QR codes
Work permit with a printable notice: in the field it is scanned and signed from a phone. LOTO warning when the job calls for it.
Maintenance and OEE
Queue prioritised by criticality, statutory maintenance schedules with their date, counters based on real usage and an OEE panel per line with a Pareto of stoppages.
Personnel and training
Fitness for work, training and health surveillance by job role, with the medical data kept outside the dashboard by design.
Open it with the logistics profile and compare it with your folder
The demo opens with no card and no sales call. You choose this same sector and walk into a plant that looks like yours, with sample data you can play with without breaking anything.
The other industries in the dashboard
Each profile brings its own vocabulary, its own areas, its own energies and its own procedures. There are sixteen.
