The plant dashboard for construction and industrial works
Open site, chained subcontracting and the subcontracting register.
Try the demo free See the pricing
- 8 standard work faces loaded
- 5 lockout energy sources
- 5 reference standards

How the work is done in construction site
The workplace changes every week: what was floor yesterday is an opening today. The safety plan is revised along with the works, not filed away with the design.
The jobs that set the pace
- Structure and formwork
- Work at height
- Excavations and trenches
- Scaffold erection
- Lifting with mobile and tower cranes
The work faces it comes with as standard
- Structure work face
- Roof work face
- Excavation and foundations
- Building services
- Material laydown
- Site cabins
- Site road
- Lifting area
Lockout/tagout, with isolation point and verification
The dashboard does not ask “what energies does your equipment have?”: in the construction site profile they are already there, each one with where it is isolated and how you check that it is isolated. It is what an inspection asks to see in writing.
| Energy | Isolation point | Verification |
|---|---|---|
| Electrical | Main site distribution board | Verification of the absence of voltage and check of the RCD |
| Hydraulics | Machine hydraulic power pack | Lowering the implement to the ground and releasing pressure |
| Stored mechanical energy | Boom and hook lockout | Load set down, hook free |
| Gravity | Propping and chocking of loads | Propping checked by the site foreman |
| Buried services | Supply disconnection arranged with the utility | Ground-penetrating radar survey and hand-dug trial pit |
The high-risk procedures, written down
Five procedures specific to construction site, written in the vocabulary of the sector and available inside the dashboard so you can adapt them to your plant.
Work at height
Collective protection first; the harness is the last resort and with a calculated anchor point.
Excavations and trenches
Shoring or battering according to the ground; buried services located before the first bucket.
Scaffold erection and use
Erected by trained personnel, inspected after every modification and status tag visible.
Lifting plan
Crane, load, slinging and area: four checks before the rope takes the strain.
Lockout on site with a temporary installation
Temporary boards with RCDs: the isolation is coordinated with the supply company.
Equipment and reference regulations
Equipment typical of this profile
- Tower crane
- Backhoe loader
- Mobile elevating work platform
- Concrete mixer
- Modular scaffolding
- Portable compressor
- Generator set
- Truck-mounted crane
Regulations that frame the work
- RD 1627/1997 · construction works
- Ley 32/2006 and RD 1109/2007 · subcontracting and the REA register
- Spanish construction sector collective agreement (VI Convenio general)
- RD 2177/2004 · temporary work at height
- RD 1215/1997 · work equipment
Current references the dashboard uses to organise the documentation. IndustriaKit is a documentation tool: it does not replace the risk assessment or legal advice.
- Approved health and safety plan
- Subcontracting register
- Subcontractor's adherence to the plan
- Construction Professional Card (TPC)
What the dashboard does with all this
Contractors and coordination of activities
Contractors working on site join free, upload their documentation and the traffic light decides who can work. RD 171/2004 coordination with minutes and signature.
Permits with QR codes
Work permit with a printable notice: in the field it is scanned and signed from a phone. LOTO warning when the job calls for it.
Maintenance and OEE
Queue prioritised by criticality, statutory maintenance schedules with their date, counters based on real usage and an OEE panel per line with a Pareto of stoppages.
Personnel and training
Fitness for work, training and health surveillance by job role, with the medical data kept outside the dashboard by design.
Open it with the construction site profile and compare it with your folder
The demo opens with no card and no sales call. You choose this same sector and walk into a plant that looks like yours, with sample data you can play with without breaking anything.
The other industries in the dashboard
Each profile brings its own vocabulary, its own areas, its own energies and its own procedures. There are sixteen.
