The plant dashboard for energy, utilities and renewables
High voltage, isolation permits and work on electrical installations.
Try the demo free See the pricing
- 8 standard installations loaded
- 6 lockout energy sources
- 5 reference standards

How the work is done in energy
Generation and distribution installations: high voltage, work at height and lone working at remote sites. The isolation permit is the central liturgy and it is followed in full.
The jobs that set the pace
- High voltage isolations
- Solar and wind farm maintenance
- Work in the substation
- Lines and ducting
- Operation of generation plants
The installations it comes with as standard
- 132 kV substation
- Transformer substation
- Switchgear room
- Solar field · string 12
- Wind turbine 07
- Battery room
- Generator set
- Control room
Lockout/tagout, with isolation point and verification
The dashboard does not ask “what energies does your equipment have?”: in the energy profile they are already there, each one with where it is isolated and how you check that it is isolated. It is what an inspection asks to see in writing.
| Energy | Isolation point | Verification |
|---|---|---|
| Electrical high voltage | Isolator open and visible earthing | Five golden rules: verify the absence of voltage and apply earthing and short-circuiting |
| Electrical low voltage | Main switch of the board | Verification of the absence of voltage with a detector |
| Photovoltaic (direct current) | String isolator and disconnection of connectors | Measurement at the terminals: the panel produces in daylight even if the inverter is stopped |
| Stored mechanical energy | Rotor and yaw system lockout | Rotor brake applied and locking pin fitted |
| Hydraulics | Pitch system power pack | Accumulator discharge |
| Chemistry (batteries) | Disconnection of the rack and the DC isolator | Voltage measurement at the rack terminals |
The high-risk procedures, written down
Five procedures specific to energy, written in the vocabulary of the sector and available inside the dashboard so you can adapt them to your plant.
Electrical isolation (the five golden rules)
Open, lock off, verify, earth and sign: at high voltage there is no short version.
Live working (TET)
Only certified personnel, with a written method and verified insulated tools.
Work on a wind turbine
Height, confined space in the hub and self-rescue: nobody climbs alone.
Photovoltaics: the array never switches off
The strings stay live in sunlight: the lockout is on the inverter and the isolation point, not on the panel.
Lone working
Scheduled check-ins and a lone-worker device at remote sites.
Equipment and reference regulations
Equipment typical of this profile
- Power transformer
- Medium voltage switchgear cubicle
- Photovoltaic inverter
- Wind turbine
- Generator set
- Battery rack
- Solar tracker
- DC switchboard
Regulations that frame the work
- RD 614/2001 · electrical risk and the five golden rules
- RD 337/2014 · high voltage regulation
- REBT · RD 842/2002
- RD 1215/1997 · work equipment
- UNE-EN 50110 · operation of electrical installations
Current references the dashboard uses to organise the documentation. IndustriaKit is a documentation tool: it does not replace the risk assessment or legal advice.
- Signed isolation certificate
- Qualification as an authorised or skilled worker
- Up-to-date single-line diagram
What the dashboard does with all this
Contractors and coordination of activities
Contractors working on site join free, upload their documentation and the traffic light decides who can work. RD 171/2004 coordination with minutes and signature.
Permits with QR codes
Work permit with a printable notice: in the field it is scanned and signed from a phone. LOTO warning when the job calls for it.
Maintenance and OEE
Queue prioritised by criticality, statutory maintenance schedules with their date, counters based on real usage and an OEE panel per line with a Pareto of stoppages.
Personnel and training
Fitness for work, training and health surveillance by job role, with the medical data kept outside the dashboard by design.
Open it with the energy profile and compare it with your folder
The demo opens with no card and no sales call. You choose this same sector and walk into a plant that looks like yours, with sample data you can play with without breaking anything.
The other industries in the dashboard
Each profile brings its own vocabulary, its own areas, its own energies and its own procedures. There are sixteen.